The 110 /10kV Substation Bor 8 project of Serbia Zijin Mining Doo Bor
Tender Announcement
塞尔维亚紫金矿业110/10kV Bor8变电站招标公告
1. Bidding Conditions
This tender project is for Serbia Zijin Mining 110/10Kv substation Bor8 project, the
tendering entity is Serbia Zijin Mining Doo Bor, and the construction funds are self-raised by
the company. This project has met the bidding requirements, and now a public bidding
process is being invited for the construction of this project..
2. Project Overview and Scope of Bidding
2.1Project location: Bor, Serbia .
2.2 Project Construction Scale: This project involves the construction of a new 110/10kV
substation, including civil works (main buildings: including high-voltage room, control room,
relay room, etc. (indoor station) or equipment foundation (outdoor station). Structures:
support foundation, main transformer foundation, cable trench, fire water tank, perimeter wall
and gate, etc. Site facilities: internal roads, water supply and drainage system, ventilation and
air conditioning system.), installation (main transformer, power distribution equipment,
lightning protection grounding, relay protection, etc.) and overhead lines .
2.3 Scope and content of the tender: All construction work including civil engineering units,
equipment installation and overhead line laying , as well as other work entrusted in writing by
the employer. For details, please refer to the subsequent bill of quantities and construction
drawings. If there is any inconsistency between the detailed construction methods and the bill
of quantities and the construction drawings, the construction drawings shall prevail .
2.4 Tender control price ( excluding tax ): 373,032,032.02 dinars (excluding materials
deviate from the actual cost , and the successful bidder shall not claim compensation on this
basis) .
2.5Construction period requirement: The planned start date isMay 1, 2026;the planned
completion date is March 31, 2027.The total construction period are 334 calendar days
(including rainy days and holidays ) .
Bidders are encouraged to develop plans to shorten the construction period and formulate
corresponding measures for this project.
The commencement date shall be subject to the commencement order issued by the
tendering party. If the total number of calendar days of the construction period is inconsistent
with the number of days of the construction period calculated based on the aforementioned
2
planned commencement and completion dates , the total number of calendar days of the
construction period shall prevail.
2.6Project quality requirements:
1) Meet all quality requirements stipulated in the concession agreement for this project;
2) Meet the functional, safety, and durability requirements of the substation's civil
engineering structures, equipment installation, overhead lines, and supporting facilities in
operation and use.
3) Acceptance is conducted in accordance with internationally recognized standards and
specifications ( primarily European standards , with relevant standards from Serbia and other
countries serving as supplementary and auxiliary acceptance standards) and current quality
standards.
4) The quality of the project entity and management practices meet the requirements of the
specifications, and the project passes acceptance at each stage.
5) Meets the requirements of the design documents and the Serbian authorities;
6) When the above quality standards have inconsistent requirements for the same matter , the
standard with the most stringent requirements shall prevail;
7) The intermediate and final acceptance of this project shall be carried out in accordance
with the corresponding sub-item project division standards and specifications of internationally
recognized standards and specifications . This project adopts joint acceptance. The acceptance by
the local government and the internal acceptance by the employer shall all meet the qualified or
above standards.
8) The contractor shall carry out construction in strict accordance with the standards,
specifications and design drawings and the instructions issued by the employer in accordance
with the contract, accept the employer's inspection and testing at any time, provide convenient
conditions for inspection and testing, and provide the employer with technical information related
to the quality of the project as required.
9) The materials and equipment procured and supplied by the contractor must meet the
design requirements, relevant quality standards and relevant government regulations , and must
be accompanied by original factory certificates of conformity and quality assurance certificates,
and if necessary, a production license in accordance with regulations must also be provided.
10) All major materials and equipment procured by the contractor must be reviewed and
confirmed by the employer and sealed before procurement . The contractor shall submit
information on at least three suppliers to the employer, including material and equipment samples,
various quality certificates and other relevant technical information.
11) Establish a testing and inspection system, accept supervision and random inspections
from the client and government departments, improve testing and inspection equipment and
3
facilities and qualified testing personnel in accordance with Serbian local standards, and strictly
prohibit falsification of testing results;
12) The testing and inspection of materials and equipment shall be conducted to ensure that
they pass the test on the first attempt . If repeated testing or rework is required, the contractor
shall bear the costs of such repeated testing and rework. The contractor shall bear full
responsibility for any failure to meet the qualified quality grade or the use of unqualified materials
or equipment and shall compensate the employer for all direct and indirect losses incurred as a
result.
13) During the contractor's construction process, the employer will conduct random
inspections. For any work failing to meet the above quality requirements, the following actions
qualification will be revoked, compensation for project losses will be awarded, and penalties will
be imposed according to the employer's corresponding quality and safety regulations. c.
Regardless of whether the employer's engineer conducts acceptance and signs off, the contractor
is not relieved of its responsibility for the quality of the contracted project.
2.7 If the project is delayed or cancelled due to objective factors such as adjustments to
Serbian policies, company strategy, or licensing procedures after the bid is won , the successful
bidder shall not demand that the tendering party bear responsibility or make any claims on
this basis.
3. Qualification requirements and review methods for bidders
3.1The following conditions must be met by the bidders for this tender project:
3.1.1This tender requires bidders to be independent legal entities registered in Serbia , and
to possess the following valid licenses: ①Business license; ②Electrical installation permits
for 110kV and above high-voltage and medium-voltage transmission lines (License No. И061Е1
) and power installation permits for 110kV and above high-voltage and medium-voltage
substations (License No. И062Е1 ) .
3.1.2 Bidders should have a branch or subsidiary registered in Serbia and meet the following
qualification requirements:
1) Qualification Information: Applicants should meet the qualifications for electrical
installation engineering of 110kV and above high-voltage and medium-voltage transmission lines
and power installation engineering of 110kV and above high-voltage and medium-voltage
substations in Serbia ;
2) Business License
3) Certificate of Incorporation of the company
4) Tax Identification Number Registration Certificate
5) Value Added Tax Registration Certificate
4
6 ) Company registration details
7 ) Tax clearance certificate
8 ) Bank Information
9 ) Other materials required for legal operation in Serbia .
3.1.3 The bidder's qualifications should meet the following requirements:
Qualification requirements and levels
5
(1)The bidder must have obtained a valid electrical installation engineering
qualification for 110kV and above high voltage and medium voltage transmission lines
and a power installation engineering qualification for 110kV and above high voltage
and medium voltage substations issued by the construction administration authority of the
Republic of Serbia , and must have at least two personnel holding IE 05- 02.1 licenses .
(2) During the qualification review, the bidder shall provide the number of registered
engineers , proof of their employment, and other supporting documents . If the bidder does
not meet the minimum number of registered personnel required above, its qualification
review will not be passed.
(3) During the bid validity period, the number of registered electrical engineers registered by the
bidder shall meet the requirements of the bidding documents . If the tendering party finds that the
registered electrical engineers do not meet the above requirements, the tendering party has
the right to cancel their qualification as a candidate for bid or the qualification as the
tendering party has the right to unilaterally terminate the contract and confiscate their
performance bond.
From the date of this tender announcement (inclusive) to the date of publication of this
tender announcement , Substation construction projects with a single contract value of
RMB 20 million (equal to 2.5 million Euros or 300 million Dinars) or more that have
been completed and passed final acceptance ( preferred experience with Serbian
substation projects ). Specific requirements are detailed in the tender documents. [Bidders
must provide copies of construction contracts and completion acceptance certificates,
performance will not be considered.]
3.2Requirements for construction site management personnel
3.2.1 The bidder shall appoint the project engineers (hereinafter referred to as the
project engineers) for this project.Personnel must possess a valid certificate issued by the
engineers must attach valid electronic registration certificate for registered construction
engineers, ID card, stamped with the official seal of the bidding entity. The proposed project
engineers must be an employee of the bidding entity, as indicated on the registered
construction engineer's certificate, and their age must not exceed [60] year old and
company must promise that engineers has no ongoing construction projects .
6
Note : (1) Other on-site management personnel to be dispatched must be current
employees of the bidder's own company, and their age must not exceed [60].The tender
must provide provide employee employment certificate and related documents.
(2) The bidder shall send one on-site management personnel to one post, and one person
shall not be assigned to multiple posts.
(3) If any of the above-mentioned professional registration certificates are changed, the
change procedures shall be completed in accordance with the relevant regulations before
qualification review will not be passed.
(4) The cost of visa processing for all the above-mentioned personnel shall be borne
processing in a timely manner caused by the bidder, the tenderer has the right to cancel the
bidder's winning bid and demand that the bidder compensate the tenderer for its losses.
3.3
Joint bid are accepted
for this project.
3.4
Bidders with any of the following circumstances are not allowed to participate in
this bidding project:
( 1 ) The bidder was acquired by Zijin Mining Group Co., Ltd. "Those who are
blacklisted."
3.5Other eligibility requirements:
( 1 ) The bidder is not in a state of being ordered to suspend business, having its property
taken over, frozen, or bankrupt.
( 2 ) Other details are available in the tender documents.
4. Obtaining Bidding Documents
4.1. Anyone interested
in participating
in
the bidding , should
register from
12.March.2026 to 1.April.2026 (serbian time,same below) through the following methods:
(download address:登录查看 and a scanned
copy of the tender document bearing their official seal to the designated email address.( pro
submitted.
5. Evaluation methods and award procedures
5.1 The evaluation method adopted for this bidding project is: the lowest reasonable price
after evaluation will be awarded the contract .
5.2 The bidding process for this project adopts a separate evaluation and award method to
determine the successful bidder .
6. Submission of tender documents
7
6.1 The deadline for submission of tender documents (hereinafter referred to as the tender
deadline ) is 8:00 on 1.April.2026 , Bid must be submitted by time ( Serbian time ) to Suvaja
185A Bor. Bids that are delivered after the deadline or not delivered to the designated
location will not be accepted by the tendering party.
6.2 When submitting the bid documents, the legal representative of the bidding unit (who
must bring qualification certificates and the original ID card ) or his/her authorized agent (who
must bring a power of attorney and the original ID card) should attend the bid opening meeting
and submit photocopies of the relevant certificates with the official seal of the bidding unit
6.3 For other matters related to the bidding for this project, please contact the tendering
party.
7. The medium for issuing the announcement
This tender notice is published by Serbia Zijin Mining Doo Bor.
Published at ( 登录查看 ).
8. Special Note: If the successful bidder engages in subcontracting, affiliation, or illegal
subcontracting, the tendering party has the right to unilaterally terminate the construction
contract and demand that the successful bidder pay [20%] of the total contract price. The
party shall bear liability for breach of contract to the tendering party and compensate for all
losses arising therefrom.
9. Contact Information
Tenderer: Serbia Zijin Mining Doo Bor
Address: Suvaja 185A Bor, Serbia
Telephone: 登录查看
Contact Person: Zou Ziqing
Zijin Mining Group's supervisory department: Inspection and Audit Office
Contact number: 登录查看
8
Unless otherwise specified, all times mentioned in this tender document are Serbian time ;
all bid prices are in dinars , and payment will be made in dinars first upon contract execution .
9
appendix:
Bidder Registration Form
Bidder's Name (with official seal ):
Tender Project Name
110/10kV Substation Project of
Serbia Zijin Mining Doo Bor
Tender Project Number
2B01GC2022030001-X-049
Qualification Level
Contact Person
Contact number
Note: Bidders should carefully fill out this registration form and submit it ( Word document).
Send the scanned copy (with official seal ) to 登录查看. Our staff will send
the bidding documents to the bidders based on the information provided above . Bidders must
responsible for any consequences .
标讯信息来源于公开渠道,仅供参考,请以官方公告为准。
同行业 · 同地区 · 最新公告